BP seeks solution after dome problem occurs


BP Plc engineers will search for a solution on Sunday after suffering a setback in an attempt to contain oil gushing into the Gulf of Mexico with a huge metal dome, dashing hopes for a quick, temporary solution to a growing environmental disaster.

The company was forced to move the four-story containment dome off to the side on the sea floor after a buildup of crystallized gas forced it to suspend the effort. Covering the leak with the structure was seen as the best short-term way to stem the flow from a ruptured oil well.

BP expects to take up to two days plotting its next move, Chief Operating Officer Doug Suttles said.


Leave a Reply

Your email address will not be published. Required fields are marked *