The Red-Dead canal could take a small step forward in light of projected environmental impacts and other constraints, says Batir Wardam. After a delay of more than six months, the World Bank has finally released the final drafts of the feasibility and environmental assessment studies for the controversial Red Sea-Dead Sea Water Conveyance project, designed to channel some 1.2 billion cubic metres of water 180 kilometres from the Red Sea to the Dead Sea.
One response to “The Red-Dead water conveyer can avoid a dead end”
.…
good info….